-
-
- Funding gap
- -
- Runway at current pace
- -
- Required pace
- -
- At the checkpoint
- -
- Slack / shortfall
- -
- Current pace
- -

Combine preparation cost with a second-front floor, then compare the gap with net income and turns before declaration.
Every number is an editable scenario. The primary source defines only the current game context.
-
Combine army setup, expected deficit and one adverse one-off payment.
The post-preparation treasury should still absorb a second front or emergency recruitment.
If the required flow cannot land in time, reduce war scope or delay optional construction.
Creative Assembly · Current primary source ↗The full guide explains which inputs must stay separate, how to run the adverse case and what to change first when the runway fails.
Read the complete guide →The playbook shows what has been checked, which layer comes next and where the decision becomes action.
The planner shows positive slack on the selected turn.
Add one emergency payment and one turn of elevated deficit before the final decision.
Open next step →